Case Studies Resin

You are here:

Take a look at some of the projects that have been completed by the Limegate group of companies to see the quality finish that we could achieve for your next project.

Robert Clack Secondary School – School of Science
London

  • 893m2
  • LimePath GeoSuDS UV Dior system
  • 893m2 of LimePath GeoSuDS UV system installed to areas that consisted of large planters and pedestrian areas to be used by children, parents and teachers. LimePath GeoSuDS UV is a high-quality Resin Bound Surfacing system which is installed at the specified depth onto our high performance triple lock system of geotextiles & a stabilisation geonet. This system reduces the need for a binder courses such as concrete and/or asphalt concrete (macadam). In summary the results are: Drainage, Filtration, Separation and Protection in only one system. The GeoSuDS system also allows for speed of installation, reduced man hours, cost savings to the client, lowered transportation costs, higher compressive strengths, long design life and the ability to handle High-capacity flow rate and a slip resistant surface underfoot.

Regent Park’s, Open Air Theatre London

  • 308 square metres
  • LimeBound product in Golden Gate
  • Feedback“Thank you for the works undertaken at Regents Park Open Air Theatre yesterday and today. Site was left all clear and tidy. I walked the job with the Client this afternoon and they were very happy with the finished works.’’

Big Motoring World Kent

  • 1,000 square metres
  • Resin bound surfaces laid throughout all three of the company’s showrooms across Kent
  • Limegate Solutions LimeBound Resin Bound Surfacing UV

Kew Gardens London

  • 1,000 square metres
  • Resin bound and hybrid surfaces laid around the footprint of the Great Pagoda as part of its refurbishment, and to park-wide footway systems
  • Addagrip Terrabase and KBI Flexipave

Legoland Windsor

  • 800 square metres
  • Resin bound and asphalt surfacing laid for a new ride, The Disc
  • Limegate Solutions LimeBound Resin Bound Surfacing UV

The Queen’s Club London

  • 2,000 square metres
  • Resin bound surface laid to all footways in front of the Club House as part of its refurbishment
  • Limegate Solutions LimeBound Resin Bound Surfacing UV

Regeneration Scheme Folkestone, Kent

  • 1,700 square metres
  • Resin bound surface laid to a new footpath at Folkstone Harbour railway station as part of the regeneration scheme
  • Limegate Solutions LimeBound Resin Bound Surfacing UV
London Zoo

London Zoo Regents Park

  • 1,000 square metres
  • Resin bound and EPDM wet pour rubber surfacing within the new Animal Kingdom
  • Addagrip Terrabase and Addaset
Lille Square Fulham

Lille Square Hammersmith, London

  • 1,000 square metres
  • Resin bound surfacing to communal walkway areas and terraces within a private residential estate
  • Limegate signature blend
Limegate Waterbeech School Cambridge

Waterbeech School Cambridge

  • 500 square metres
  • Resin bound surfacing to the communal courtyard designed for recreational activities
  • Limegate signature blend